Takes 60 seconds · No contact info required yet.

Grey Water Systems · Albuquerque & Santa Fe

Your water. Used twice.

Reclaim catches your shower, laundry, and sink runoff — filters it clean — and pushes it back out to irrigate lawns, flush toilets, and cool rooftop condensers. 300 gallons a day, used twice.

See how it works

Takes 60 seconds · No contact info required yet.

Scroll

0 gal

Daily Water Reclaimed

Per 4-bed home

0%

Permit Approval Rate

Across NM & AZ

0+

Installations Complete

Since 2017

0%

Avg. Utility Reduction

First 12 months

Ready to stop paying twice for water you already own?

Takes 60 seconds · No contact info required yet.

Find Your Complexity Level

Simple to whole-house. Your call.

Every visitor finds their comfort level. Start with a single diverter. Grow to full recirculation. The permit path is the same either way.

Simple bathroom sink diverter valve with clear grey water pipe running to garden outside window
Entry Level

40–60 gal/day

reclaimed daily

Sink & Shower Diverter

One bathroom. One pipe. Real savings.

The simplest entry point: a single three-way valve reroutes bathroom sink and shower drain to a compact 50-gallon surge tank, through a two-stage filter, and out to one irrigation zone. No slab penetration. Installed in a weekend. This is where most homeowners start.

Water Sources

  • Bathroom sink
  • Shower drain

Reuse Destinations

  • 1 drip irrigation zone

1–2 days

Install Time

$2,400

Starting At

Yes

Permit Included

Ready to stop paying twice for water you already own?

Used by 340+ homeowners across the Southwest.

Real Outcomes

Three clients. Three mandates.

Homeowner
"Our water bill dropped from $340 to $128 the first month. Reclaim's team handled the permit, the inspection, and the city sign-off. I didn't make a single phone call to the municipality."

$212/mo saved

Hispanic woman in her 40s smiling outdoors in a garden setting

Maria Delgado

Homeowner, Albuquerque NM

Builder
"Every net-zero project we spec now includes a Reclaim whole-house system. The permit documentation they provide is cleaner than anything I've seen from specialty subs — LEED reviewers love it."

14 projects spec'd

Asian American man in his 30s wearing a hard hat at a construction site

Trevor Huang

Principal, Mesa Verde Custom Homes

Commercial
"The city's reuse mandate gave us 18 months to comply across four properties. Reclaim permitted and installed all four on schedule. The flow meters they wired feed directly into our BMS dashboard."

4 properties compliant

Latina woman in business attire standing in a modern office building lobby

Sandra Reyes

Portfolio Manager, Cienega Commercial Properties

Ready to stop paying twice for water you already own?

Permitted, inspectable, and backed by a 10-year workmanship warranty.